You're not online

Check your internet connection.
currently offline

ICE RINK WAIDHOFEN

For the first time, the municipality of Waidhofen in Austria is relying on Framewert for its ice skating concept.

The substructure for the ice rink at Taya Park (shopping center) was realized in record time with the height-adjustable floor system.

You too can rely on performance, speed and flexibility!

  • AreaSports & Leisure
  • PlaceAustria
  • Productsheight-adjustable floor system with 1.25m grid
  • floor area800 sam
  • Assembly time2 days
  • Disassembly time1 days
(DE) Framewert Iglu System als Eislaufhalle in Malta (EN) Framewert Igloo system as ice rink hall in Malta

Are you interested in one of our solutions?

Start inquiry now